Real-time impact dynamics in condensed matter by laser pulse

January 7 2015
Types d’événements
Séminaire SPEC
Hervé Cailleau
SPEC Salle Itzykson, Bât.774
January 7 2015
from 11:00 AM at 11:00 AM

There is a remarkable development in the field of ultra-fast time-resolved measurements in solids, in which a pump laser pulse is used to prepare the system into highly excited state, while the real-time induced electronic and/or structural dynamics is tracked with subsequent probe pulses. This adds a temporal dimension on top of energy and momentum. Nowadays, laser sources are able to deliver ultra-short pulses, typically of few femtosecond duration, thereby shorter than the time scale of atomic motions. They cover diverse spectral ranges, from THz to hard X-rays. Moreover, these pulses can be very intense, possessing a macroscopic number of photons and an extremely large instantaneous electric field. We are able to act strongly and timely on the course of atomic processes in a material. The cooperative interaction in solid state may lead to positive feedback, underpinning non-linear responsiveness and threshold effect. These photo-induced phenomena may trigger a spectacular transformation of the macroscopic state and functionality of a material (from insulating to metallic, from non-magnetic to magnetic,.). Several experiments have provided new insights into the transformation of diverse materials, from the melting of charge or spin order in electron correlated system to cooperative molecular switching in the solid state. These real-time experiments allow to disentangle in time complicated electronic and lattice processes (“dissecting” the Hamiltonian). The possibility to trigger the dynamics coherently makes the process particularly efficient (“selecting” inside the Hamiltonian). These different aspects will be discussed, as the recent opportunity to directly act on the motion of electrons (“modifying” the Hamiltonian).

Institut de Physique de Rennes