Video of the first test assembly of the Time of flight chamber of CSPEC

Video of the first test assembly of the Time of flight chamber of CSPEC

img

One the master piece of the futur CSPEC spectrometer to be built at the ESS is the time of fligt chamber.

Designed by the LLB, its manufacturing is nearly complete at SDMS. Build in 3 big parts, its final test assembly has just been done by SDMS: see attached video (to be read with VLC).

VIDEO-2024-05-29-15-31-36.mov (4.2 Mo)