CEA |   |   |   |   |   |   | webmail : intra - extra |  Accès VPN-SSL | Contact
LLB on IN6-Sharp at ILL
LLB on IN6-Sharp at ILL

CAD view of the Sharp project at ILL

LLB is engaged in the upgrade of IN6 through a CRG contract of type A. This upgrade will be performed during the 2019 shutdown of ILL, but LLB is already in charge of the IN6 spectrometer. The IN6-Sharp LLB team will welcome users as soon as the ILL reactor restarts (March 1st 2018).

Details of the upgrade could be find in the following pdf file :

Sharp_lancement fédération 16 mai_2017-V2.pdf

 
LLB on IN6-Sharp at ILL

IN6 at the ILL

Last update : 01/12 2018 (2766)

 

Retour en haut