Laboratoire Léon Brillouin

UMR12 CEA-CNRS, Bât. 563 CEA Saclay

91191 Gif sur Yvette Cedex, France

+33-169085241 llb-sec@cea.fr

Let's scatter neutrons

img21 or 22 Nov. Startup of the Orphe reactor  
During the 2006 summer shutdown, a helium test revealed a leak in a seal of a small water pipe (1cm in diameter). The repair is now done and the startup of the Orphee reactor will occur on November 21 or 22.
A. Menelle, 2006-09-26 00:00:00

 

Retour en haut