| | | | | | | webmail : intra-extra| Accès VPN| Accès IST| Contact
The IPHI - Neutrons project
logo_tutelle logo_tutelle 

Various news about the SESAME IPHI - Neutron project which is supporting the construction of a 50kW CANS demonstrator at the CEA Saclay.

The project is supported by the Region Ile de France  


Mars 2020

The cycle of target testing at 3kW with a power density of 500W/cm² on a Beryllium target was suspended in February. During the previous months, several targets were tested. Some of the targets were operated for about 100 hours corresponding to integrated currents up to 110mA.hours. The proton beamline and the target will be upgraded during spring 2020 to be able to operate at proton beam powers up to 50kW.


June 2019

A first reflectivity experiment was performed on IPHI.

 


June 2019

A first radiography was performed on IPHI

 


June 2019

A first diffraction experiment was performed on IPHI

 

 


April 2019

The IPHI - Neutron 7kW set-up has been completed. The first 1kW of power has been sent on the target on April 5th.

Status_April2019.JPG (464×694)


February 2019

A beam profiler has been installed before the target. I allows tuning the optics to optimize the beam spread over the target.
Horizontal and vertical beam profiles before and after tuning.

BeamProfiles.jpg (700×552)


December 2018

The first proton beam has been sent on the Target Be_V2_7kW.

Shape of the proton beam on the target vizualized with a scintillator for peak currents of 10mA and 60mA. The illuminated area is about 50mm across. The beam power was limited to about 10W to avoid damaging the scintillator.

 

 
#2956 - Last update : 07/02 2020

 

Retour en haut